Up to 10% more trailers per workstation annually
As part of the “ewm maXsolution” holistic
consultation solution, specialists at
EWM AG, Mündersbach/Germany, closely
examined the entire production process of
Hüffermann Transportsysteme GmbH from
Neustadt (Dosse)/Germany – discovering
enormous potential for savings. After optimising
a welding workstation in line with
recommendations from EWM, this market
leader in systems for transport and recycling
vehicles manufactured up to 10% more trailers
in just one year at just one workstation –
a considerable increase in output – while at
the same time reducing working time by up
to 15%. Based on these results, Hüffermann
will be switching over all 68 of their welding
production workspaces to EWM products by
the end of the year.
An active subscription enables you to download articles or entire issues as PDF-files. If you already are a subscriber, please login. More information about the subscription