"TowerPower" launch points to reduced costs for offshore wind inspections
In May 2014, the 11 partners of the European
collaborative project “TowerPower“
met in Aix-en-Provence/France to launch a
programme of work to develop a remote
real -time monitoring system for ageing diagnosis
of offshore wind turbine structures.
This development meets a real demand
from offshore wind park operators looking
to reduce maintenance costs by increasing
the time period between on-site inspections.
The project will last three years with a budget
close to € 2 million.
An active subscription enables you to download articles or entire issues as PDF-files. If you already are a subscriber, please login. More information about the subscription