- Anzeige -
- Anzeige -

Goldschmidt Thermit Group joins rails continuously on new Erfurt to Leipzig/Halle section of railway track


From Companies

On 9 December 2015 the new high speed intercity connection between Erfurt and Leipzig/Halle was inaugurated. The new section is part of the new and extended railway connection from Nuremberg to Berlin within the German reunification 8 project and is a part of the trans-European transport network from Northern Italy to Scandinavia.
Page: 89:
Issue 2 (2016) Page 89

This article appeared in issue 2 (2016).

Issue 2 (2016)
Welding and Cutting
Issue 2 (2016)
› learn more
An active subscription enables you to download articles or entire issues as PDF-files. If you already are a subscriber, please login. More information about the subscription

More content

- Anzeige -
- Anzeige -
- Anzeige -