- Anzeige -
- Anzeige -

Construction has started on new TWI building in Malaysia


News

In recent years annual growth rates as high as 30% have been achieved at TWI’s training business in South East Asia and as a result the current facility in Kuala Lumpur can no longer accommodate TWI’s needs. As the facility cannot be extended further, a decision was taken in 2011 to move to a new, much larger, purpose-built facility.
Pages: 132 - 133:
Issue 3 (2013) Page 132
Issue 3 (2013) Page 133

This article appeared in issue 3 (2013).

Issue 3 (2013)
Welding and Cutting
Issue 3 (2013)
› learn more
An active subscription enables you to download articles or entire issues as PDF-files. If you already are a subscriber, please login. More information about the subscription

More content

- Anzeige -
- Anzeige -
- Anzeige -